Canberra Ex-Govie Bathroom Case Study: From Concept Design to Finished Bathroom

This Canberra family was renovating their 1969 ex-govie home and had a clear concept design for the bathroom. We turned that concept into a finished room, working around the quirks of an older building. Along the way we guided the family through each stage, including which trades to bring in and when.
Project Overview
Location: Canberra
Property: 1969 ex-govie home, part of a wider renovation
Project: Bathroom renovation, including surface preparation, waterproofing and tiling
Starting point: The homeowners’ own concept design
Result: A finished bathroom that matched the concept, and clients who’d recommend us to friends and family
The Challenge
An older building. Homes from the late 1960s rarely have straight walls or level floors. Decades of settling mean the surfaces need work before new waterproofing or tiles go on.
A concept design to deliver. The homeowners knew exactly how they wanted the bathroom to look. The finished room had to match it in the details, from tile layout to alignment.
Several trades in one small room. Plumbing and electrical work both meet the tiling. If a fitting is in the wrong spot or a trade works out of order, the tiling inherits the problem.
Plenty of decisions along the way. A bathroom renovation involves a lot of choices that need to happen in the right order. The family wanted guidance through the process as well as the tiling itself.
How We Worked With the Other Trades
Rob recommended trades the family could use. He also explained where each trade’s work met the tiling, so issues were picked up before they were built in.
Trade | Where it meets the tiling | What we sorted out early |
Plumber | Tap, shower and waste positions | Set positions to suit the tile layout so fittings sit neatly within the tiles |
Electrician | Exhaust fan, heated towel rail, lighting | Agreed positions before the walls were sheeted and tiled |
Builder or carpenter | Wall framing and sheeting | Checked the walls were straight and solid enough to tile |
Shower screen installer | Fixing points and measurements | Measured after tiling so the screen fits the finished surfaces |
Our Process
Step 1: Review the concept on site. We checked the homeowners’ design against the actual room. Anything the older building would affect was flagged before work started.
Step 2: Plan the tile set-out first. We worked out where joints, cuts and feature tiles would land so the room looks balanced. Doing this early lets plumbing and electrical positions line up with the tiles.
Step 3: Prepare the surfaces. We corrected the uneven walls and floor so the new membrane and tiles had a sound, flat base.
Step 4: Set the falls and waterproof. The floor was built to slope towards the drain. Then a new membrane went on and was given its full curing time before any tiling.
Step 5: Tile and seal the joints. We tiled to the planned set-out. Flexible sealant went at the wall and floor junctions, where movement would crack rigid grout.
Step 6: Keep the homeowners informed. We answered questions quickly and explained each decision as it came up, so the family always knew what was next.
The Outcome
A bathroom that matches the concept. The finished room reflects the design the homeowners started with.
A solid base in an older home. Proper surface preparation means the tiles sit flat and the waterproofing has a sound base.
Trades that fitted together. Fittings and fixtures were positioned around the tile layout, so everything lines up in the finished room.
Homeowners who knew what was happening. Clear, responsive communication kept the family across every stage.
A client for the long term. The homeowners said they wouldn’t use anyone else in future.
Client Review
“Bringing on Rob was the best decision we could have made for our bathroom renovation. We are renovating our 1969 ex govie home in Canberra which brings its own difficulties being an older building. However Rob brought years of experience, attention to detail and amazing value add in terms of guiding us through the process, recommendations for other trades that interact with the tiling and how to ensure the final product ended up as we wanted it. He was responsive and kind in all communications. We would not go with anyone else in future and would highly recommend Rob to all friends and family.”
Renovating an older Canberra home? Contact us to discuss your bathroom project.